Winter/Spring 2019
- Complete installation of the permanent treatment system; it is expected that the Advanced Oxidation Process will be installed and operational by the end of Winter 2019.
- Complete start-up sampling of the treatment system as presented in the 100% Removal Design-Treatment System.
- Continue operations of the TGTS system until the permanent system is operational.
- Commence Shakedown Period