Total Groundwater Processed Through mid-June, 2019, approximately 1.35 million gallons of groundwater have been processed through the Permanent Groundwater Treatment System (Final Treatment System), which has been operational since April 2, 2019.
Previously, approximately 17 million gallons of groundwater were processed through the Temporary Groundwater Treatment System (TGTS) to maintain hydraulic capture of the plume. The TGTS operated from May 23, 2017 until the Final Treatment System was operational.
Groundwater NTCRA
Updates
Introduction
Building DemolitionNon-Time Critical Removal Action (NTCRA)
Environmental RemediationRemedial Investigation / Feasibility Study (RI/FS)
Quick Links
RSS Feeds
The Feasibility Study Report for the Nuclear Metals, Inc. Superfund Site is complete and available to download. Individual components of the 3 NOV 2014 EPA approved report can also be found on the RI/FS Related Documents page.
Last updated on January 6, 2021