Interior Building Demolition Near Completion

Building A- Second floor

Building A- Second floor

Interior building demolition is essentially complete with the removal of the non-structural walls. Initiating HEPA vacuuming of the surfaces to remove dust and adding an application of “lock down agent” to further control dust. Anticipate building demolition to begin Summer 2015. For more progress photos, see NTCRA Progress.

CREW and 2229 Main Street met with Agencies on site on 17 March 2015

Public groups and de maximis met with the Agencies on 17 MAR 2015 on site to discuss the NTCRA status and schedule for building demolition as well as the planning for the remedy for 1, 4-dioxane in groundwater. The 2229 Main Street Committee provided an update to the Town’s approach to potentially taking the Site.

Work Resumes as Snow and Ice Thaws

Work resumes in the previously closed buildings as the snow and ice thaws and Spring approaches Concord. The site is gearing up for the next shipping campaign, due to start in early April 2015.

Work in Buildings, A, B, and C on Hold Due to Snow

Approximately 4 feet of snow, more in some areas, covers the rooftops in Buildings A, B, and C. In the interest of worker safety, work is suspended in these areas pending rooftop snow removal. The contamination reduction zone has been moved to Building D and work will continue in Building D and E. See NTCRA Progress for more snow photos.

Aerial view of NMI site on Friday, 13 FEB 2015.

Public comment period draws to a close

Public comments on the Proposed Cleanup Plan will be accepted through 14 JAN 2015.  See the USEPA news release for more information.

High Hazard Work Continues

High Hazard Work continued during December 2014 and January 2015. Decontamination and clean-out progressed, especially in the former Hydrofluoric Acid area as shown. To see more photos of progress, go to NTCRA Progress.Bldg Former HF Area

Public Hearing on 10 DEC 2014

The Public Hearing on the Proposed Remedial Action Plan for the Nuclear Metals, Inc. Superfund Site will be at 6:30 pm on Wednesday, December 10, 2014, also at the Concord Town Hall Meeting Room, 22 Monument Square, Concord, MA.

Public Review and Comment Period Extended

USEPA issued a news release today to announce the extension of the public review and comment period. Public comments on the Proposed Cleanup Plan will be accepted through 14 JAN 2015. USEPA will also hold a formal public hearing, where oral comments will be accepted on the Proposed Plan, on Wednesday, 10 DEC 2014 at 6:30 p.m. at the Concord Town House, 2nd Floor, 22 Monument Square, Concord, Mass.

Recent Shipping Campaign Complete

Thirty-two (32) Intermodal containers were shipped off-site during the recently completed eight-day shipping campaign that ended Wednesday, 12 NOV 2014. This week, approximately 12,000 gallons (three tankers) of RCRA nonhazardous water from the FRAC tank will be loaded and transported of US Ecology in Idaho.

Public Meeting Presentation 12 NOV 2014

USEPA presented the Proposed Remedial Action Plan for the NMI Superfund Site last night at 6:30 pm at the Concord Town Hall Meeting Room at 22 Monument Square, Concord, MA. To download a copy of the presentation, click here.