GW Treatment System Building, January 2019.
GW Treatment Building Backwash System, January 2019.
GW Treatment Building Reactor Chamber with Lamp Ends, January 2019.
GW Treatment Building Vanox Unit with persulfate tank, January 2019.
Floor of GW Treatment Building prepped for equipment pads, December 2018.
Completed concrete floor of GW Treatment Building, December 2018.
Pouring of concrete slab in GW Treatment Building, December 2018.
Interior of GW Treatment Building, prepped for concrete, December 2018.
Installation of wall panels and insulation for GW Treatment Building, November 2018.
Placement of GW Treatment Building steel frame, October 2018.
Completed foundation for the GW Treatment Building, September 2018.
Temporary Groundwater Treatment System on the Knox Trail Property, operating since May 2017 and maintaining the hydraulic containment.