Through mid-June, 2019, approximately 1.35 million gallons of groundwater have been processed through the Permanent Groundwater Treatment System (Final Treatment System), which has been operational since April 2, 2019.
Previously, approximately 17 million gallons of groundwater were processed through the Temporary Groundwater Treatment System (TGTS) to maintain hydraulic capture of the plume. The TGTS operated from May 23, 2017 until the Final Treatment System was operational.
Visit GW NTCRA Progress Photos for more photo updates.
GW Treatment System Vanox Unit with persulfate tank, January 2019.
GW Treatment System Building, January 2019.
Last updated on January 23, 2019